The website I found the following information on:
http://www.landrover.com/gb/en/lr/defender/explore/defender-professional/
"Dropsides
The Defender 130 Dropside in either Single or Double cab format provides huge load carrying capacity and a whole lot more. The corrosion resistant body is constructed from aluminium with zinc plated catches and corner pillars. The totally flat, wheelarchless load floor with hinged removable side boards, back boards and corner pillars all make for fast and easy load management. With a payload of 1200kg through, class-leading towing capability of up to 3500kg and optional tipper functionality, this is a truly remarkable load carrier."
This is relevant to the group becasue it gives us a maximum weight for our crane structure when it is dis-assembled for transport.
Subscribe to:
Post Comments (Atom)
Project Schedule
- Initial Group Meeting Tues 09.03.10 - 10.30am
- Project Meeting [loft] 11.03.10 - 1pm
- Project Meeting [loft] 16.03.10 - 10am
- Project Meeting [loft] 18.03.10 - 10am
- Project Meeting [loft] 22.03.10 - 10am
- Project Meeting [loft] 25.03.10 - 1pm
- Project Meeting [loft] 19.04.10 - 10am
- Project Meeting [loft] 22.04.10 - 1pm
- Tender Proposal Due - 23.04.10
- Project Meeting [loft] 26.04.10 - 9.00am
- Project Meeting [loft] 28.04.10 - 08.00am
- Tender Presentation [mb 568] 28.04.10 - 10am
- Group Blog Deadline - 28.04.10 - 23.59
No comments:
Post a Comment